Core functions and wide applications

- Professional manufacturing, precise installation -

More than ten precision processes ensure the successful delivery of every project

1
2
3
4
5
6
7

Design and material preparation

Design based on customer needs and standards, selecting high-quality boards

Blanking and beveling

CNC precision blanking to prepare for high-quality welding

Rolling and rounding

Ultra-high precision rolling to ensure cylinder roundness

Assembling and welding

Automatic welding process to ensure the strength and beauty of the weld, 100% flaw detection

Heat treatment and non-destructive testing

Eliminate stress and meet performance standards; RT/UT/MT multi-channel detection

Anti-corrosion and surface treatment

Sa2.5 level sandblasting and rust removal, multi-layer high-performance anti-corrosion coating

Transportation and on-site installation

Professional transportation solution, experienced team on-site guidance for installation

- Global project case testimonials -

Hefei Changfeng Taolou Town Project Case

Hefei Changfeng Taolou Town Project Case

Hefei Changfeng Taolou Town Project Case

Hefei Changfeng Taolou Town Project Case

Hefei Changfeng Taolou Town Project Case

Hefei Changfeng Taolou Town Project Case

- Construction technology -

Cylindrical water tank installation process

The installation of the cylindrical water tank adopts the technically mature inversion method. During the installation process, the group pole tooling is used to lift or lower the tank.

🔧 ● Flip chip method
🏗️ ● Group holding pole (design requirements: meet the maximum hoisting weight, stable installation, balanced force, and easy construction)

Diagram of group pole tooling system

Diagram of group pole tooling system
Cylindrical water tank construction process flow

Balance mark diagram

Balance mark diagram

Schematic diagram of assembling the melon petals on the top of the tank

Schematic diagram of assembling the melon petals on the top of the tank