Integrated fire pump stations
Above-Ground Fire Pump House for Phase II EPC Works at Hefei Binhu National Forest Park
01 / Projects in the field
Project overview
The above-ground fire pump house for the Phase II EPC works at Hefei Binhu National Forest Park, undertaken by Hefei EPNNEL Water Supply Technology Co., Ltd., has been completed and accepted. Its delivery strengthens the park's fire water supply infrastructure and protection of this urban green space.
Hefei Binhu National Forest Park is an important ecological buffer and recreation destination with extensive woodland and natural resources. To improve its fire protection infrastructure and emergency response capability, EPNNEL undertook the above-ground fire pump house for the Phase II EPC works, drawing on its experience in fire water supply engineering.
The project uses an integrated above-ground pump house combining the fire water tank, sprinkler pumps, pressure-maintenance equipment, environmental control and intelligent controls. The arrangement supports a compact footprint, convenient installation, stable operation and accessible maintenance. The main equipment is described below.
Fire water storage: a 12×6×3.5m BDF composite-panel tank, with side-panel thicknesses of 4.4mm and 3.4mm, and a 2.0mm galvanized-steel roof. The materials provide structural strength and corrosion resistance for long-term service.
Fire water supply: two 37KW sprinkler pumps with star-delta starting, configured as duty and standby units, together with a complete pressure-maintenance system to keep the fire network pressurized.
Pump-house structure: both the enclosure side panels and roof use 2.0mm galvanized steel for strength, durability and protection.
Environmental systems: tank inlet fittings, dedicated fire pump room signs, standardized earthing and a Shiteng dehumidifier support the equipment's operating environment.
Intelligent controls: a combined fire control cabinet and a water-level display cabinet provide centralized control, real-time monitoring and alarms.
EPNNEL organized the works around quality and safety, following the applicable national fire engineering requirements and EPC project management arrangements. A dedicated management and installation team prepared the construction plan, coordinated the programme, checked incoming materials and controlled workmanship. Despite a tight schedule, the team completed the works ahead of the planned programme while maintaining construction quality and safety.
The completed installation improves the park's ability to respond to fire emergencies and provides a more reliable fire water supply for visitors, staff and ecological resources. It also adds to EPNNEL's experience in ecological park applications, covering integrated fire pump-house design, manufacture, installation and service.
EPNNEL will continue developing its engineering capabilities and services to provide fire water supply solutions for further projects and support urban fire safety.
02 / Projects in the field
On-site gallery
Select a photograph to view the full-screen gallery.




Back