Integrated grease separation and lifting
Grease Separation and Lifting System for Building 6 of Kaifeng International Exchange Centre
01 / Projects in the field
Project overview
Hefei EPNNEL Water Supply Technology Co., Ltd. has completed on-site installation and commissioning of the integrated grease separation and lifting equipment for Building 6 of Kaifeng International Exchange Centre, Henan. The fully automatic system has a total treatment flow of 15m³/h. Oil–water separation and intelligent controls provide an integrated solution for the building's catering wastewater and environmental services.
As a regional business and service facility, the catering area in Building 6 generates substantial oily wastewater and requires reliable treatment, environmental compliance and convenient maintenance. EPNNEL tailored an integrated solution to the drainage conditions and available space. Automatic solids removal, oil–water separation and wastewater lifting replace a conventional masonry grease trap and address pipe blockages, odour dispersion and frequent manual cleaning.
The equipment has a SUS304 stainless-steel body with a wall thickness of 2.0mm and an oil-ground brushed finish. Overall dimensions are 2450×1400×1790mm. The grease separator and lifting chamber can be separated for maintenance. An automatic screw screen intercepts and discharges solid food residues, reducing manual cleaning. A grease inspection window makes separation visible, while separate grease and solids containers collect the separated waste streams.
The rated total flow is 15m³/h, with a pump head of 15m. The controls run a single pump at low flow and both pumps at high flow to combine efficient operation with peak drainage capacity. The cabinet uses CHINT components, a programmable PLC and an LCD to show equipment status, level information and alarms, supporting fully automatic unattended operation. There are 2 sets of cable float switches for level signals. The wastewater pumps use coupling installation so that a pump can be lifted for maintenance without dismantling the pipework.
The inlet uses a DN100 flange; the outlet, vent and drain are DN50. Stainless-steel quick-fit spherical check valves and a common discharge connection complete the pipework. The base is welded from No. 8 galvanized channel steel for structural stability and corrosion protection. The project scope includes positioning the equipment, connecting inlet and outlet pipes, wiring the main supply and commissioning the complete system. EPNNEL's on-site team carried out each stage in accordance with the construction requirements to support successful commissioning and stable compliant discharge.
The delivery adds to EPNNEL's commercial catering wastewater experience. With equipment manufacture, project-specific design and installation and commissioning services, the company supplies grease separation and wastewater solutions for commercial complexes, hotels and institutional kitchens. EPNNEL will continue improving integrated treatment equipment to support efficient operation and urban environmental objectives.
02 / Projects in the field
On-site gallery
Select a photograph to view the full-screen gallery.




Back