Project overview

Hefei EPNNEL Water Supply Technology Co., Ltd. has completed installation, commissioning and delivery of the buried integrated fire pump station for the integrated generation, grid, load and storage project in Wujiaqu, Sixth Division of the Xinjiang Production and Construction Corps. The installation supports fire safety at this energy base and adds to EPNNEL's experience in renewable-energy water infrastructure.

The solution addresses Xinjiang's severe cold, windblown sand and the project's fire protection needs. The main station measures 8×5×3 metres, using a prefabricated galvanized-steel enclosure with 5.0mm side panels and a 4.0mm roof for corrosion protection and structural resistance to underground pressure and buoyancy. It integrates a hydrant pump skid with DN200 suction and DN150 discharge connections, an independent pressure-maintenance set and dedicated drainage pumps. Mechanical exhaust ventilation, a sliding equipment-room door and access steps are supplemented by video monitoring, a dehumidifier, electric heating and a level display cabinet, combining fire water supply, environmental control and condition monitoring.

The buried integrated arrangement reduces the surface footprint, supports insulation and frost protection, and fits the energy site's layout. Factory prefabrication and modular site assembly shorten installation while supporting manufacturing accuracy and system performance. EPNNEL's team managed the remote location and complex environment through design, manufacture, installation and commissioning, following GB50974-2014, the technical code for fire water supply and hydrant systems, and other project requirements.

The Wujiaqu delivery extends EPNNEL's work in fire water supply for renewable energy. As integrated energy, storage and photovoltaic facilities expand, the company will continue developing buried station designs, intelligent controls and environmental adaptations to provide dependable fire water supply for energy infrastructure.

Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 1
01Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 1
Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 2
02Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 2
Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 3
03Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 3
Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 4
04Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 4
Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 5
05Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 5
Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 6
06Buried Fire Pump Station for the Sixth Division Wujiaqu Integrated Energy Project, Xinjiang — 6
← All projectsContact EPNNEL ↗

← ↑ Previous · → ↓ Next · Esc Close · Swipe horizontally or vertically on mobile