Containerized Fire Pump Station
PetroChina Containerized Fire Pump Room in Yan’an, Shaanxi
01 / Projects in the field
Project overview
Factory-prefabricated integrated fire pump room | Containerized above-ground tank-and-pump project for a PetroChina station in Yan’an
Energy stations around Yan’an in northern Shaanxi, on the Loess Plateau, face rugged terrain, difficult civil works, severe winter cold, large day–night temperature differences and limited site construction windows. Conventional concrete fire pump houses require excavation, masonry, insulation and equipment installation on site. Local weather and ground conditions can make these operations difficult and extend construction schedules. A containerized above-ground integrated fire pump room brings factory prefabrication, complete-unit transport and rapid positioning to this type of project.
The project serves a PetroChina outdoor station in Yan’an, Shaanxi. It uses an XBZ6×3.5×3SYP containerized above-ground integrated fire tank-and-pump station. The enclosure measures 6m long, 3.5m wide and 3m high, with an overall enclosure weight of 3420kg. The project documentation specifies T/CECS6232019, Technical specification for application of prefabricated integrated fire water supply tank-and-pump stations, as the design and manufacturing basis. The unit replaces a conventional civil-built pump house and supplies the station’s indoor fire hydrant system.
Enclosure construction for outdoor conditions in northern Shaanxi
The entire enclosure is manufactured in the factory. A heavy structural-steel frame uses welded square tubes, channels and angles; the floor is finished with chequered steel plate, while colour-coated steel and corrugated panels form the exterior. Insulation covers the walls, roof and floor to reduce the risk of freezing damage to pipes, valves and electrical equipment during cold winters and large temperature swings, supporting outdoor installation.
The enclosure has a double-leaf fire door and a single-leaf fire door for equipment-room fire separation. Cutting, welding, anticorrosion painting, insulation installation and door fitting take place in a controlled workshop, reducing the variability of outdoor site work. The finished pump room is transported to the project as a complete unit.
Factory-prefabricated fire protection pipework
The complete hydrant-system pipework is assembled inside the container at the factory, reducing on-site cutting and welding. A DN150 main discharge line has a separate flow-test circuit for commissioning and performance checks. A separate DN125 inspection and pressure-relief line integrates a grooved filter, pressure-sustaining relief valve, grooved gate valves, elbows and tees for automatic pump inspection and overpressure protection.
The pressure-maintenance assembly includes connecting pipes and valves between the jockey pumps and main pumps, together with a pressure-maintenance inlet assembly. Standard grooved and flanged connections simplify assembly. Pipes and valves use a consistent fire-red finish and an orderly layout for inspection. A DN200 inlet line provides the tank replenishment connection.
Integrated environmental, electrical and maintenance facilities
For an outdoor station with limited maintenance resources, the pump room integrates environmental control, electrical equipment, safety provisions and servicing facilities:
Temperature control and ventilation: a 1.5P inverter air conditioner and an axial-flow fan regulate the indoor temperature and air circulation for the pumps, control panels and electrical components.
Maintenance lifting equipment: a CD1 electric hoist rated at 1 tonne is preinstalled on a 12# I-beam. It allows heavy pumps and valves to be lifted inside the enclosure during servicing without dismantling the building structure.
Electrical cable-tray system: fire-resistant cable trays support star–delta starting for two 45KW fire pumps. Cables, flexible metal conduits and terminals are prewired in the factory to reduce site wiring work.
Lighting, earthing and identification: general lighting and explosion-protected emergency lighting are integrated. Galvanized flat steel forms the pump room’s equipotential earthing system. Valve-position labels and equipment warnings support routine station inspections.
Installation accessories: bolts, pipe supports, welding consumables, seals and anticorrosion coating materials are supplied with the equipment as a coordinated set.
Project advantages of the containerized fire pump room
Less on-site construction: enclosure fabrication, pipe assembly, electrical wiring, insulation and corrosion protection are largely completed in the factory. Once the foundation is ready, the delivered unit needs inlet and outlet connections and electrical power before commissioning, helping accommodate a short station construction programme.
Outdoor installation: the insulated enclosure reduces the need for a separate pump-house building and addresses cold weather, windblown dust and large day–night temperature differences in northern Shaanxi.
Accessible maintenance: an orderly interior, lifting equipment, lighting, earthing and clear identification support routine inspections, annual fire-system testing and repairs.
Compact installation and relocation: the complete unit limits civil works and can be lifted and transported as a whole when a station is modified or relocated, allowing equipment reuse.
Fire-system functions: the project documentation specifies design to the prefabricated tank-and-pump station specification, including inspection pressure relief and flow testing to support project acceptance.
Project review
The Yan’an PetroChina project brings the pump-house enclosure, fire protection pipework, valve assemblies, electrical controls and environmental and maintenance facilities into one containerized unit. This approach addresses the difficult terrain, climate and civil works of outdoor energy stations on the Loess Plateau while considering fire protection, construction and ongoing operation.
The project offers a practical reference for oil and gas stations, mining sites, remote infrastructure sites and factory expansion projects with restricted civil construction conditions. Modular, prefabricated pump rooms provide an approach that can be adapted to other outdoor fire water supply projects.