When several collection pits fill, which valve opens first?

Pit level, waiting time and available vacuum all matter. Follow one staggered collection cycle to see how these signals work together.

Decide which pit needs collection

Opening an interface valve lets the pressure difference move wastewater into the vacuum main. Each opening affects pressure in the shared main, so scheduling considers both the stored water in each pit and the available pressure difference.

Collection tank, vacuum pumps and discharge piping in a vacuum station

Follow a collection cycle

  1. Collect

    In the demonstration the second pit opens first. The other pit waits. The pit number does not set its priority.

  2. Restore vacuum

    After the second valve closes, the vacuum pump removes air. Read the valve feedback alongside tank gauge pressure to see the pressure difference recover.

  3. Admit the next inflow

    The first pit then opens and the tank level rises. The vacuum pump removes air, while the discharge pump moves stored wastewater downstream.

Choose Peak inflow and pause at each step. Pressures, levels and times illustrate the sequence. A project review also needs pit dimensions, the level sensing method and the pipe route.

Watch staggered collection