Planning maintenance hatches and equipment removal for a buried fire pump station

A hatch that admits personnel is only one part of the route for removing a pump component. The route extends from its mounting position to a receiving area at ground level.

Trace two routes

On the plan, trace the personnel route to the equipment and the removal route for the component. Check clear space at turns and the direction in which covers open. Include installed pipes and supports.

Photograph from the Makeng Mining project in Longyan. Pump and pipe positions help identify the space available for maintenance.
Photograph from the Makeng Mining project in Longyan. Pump and pipe positions help identify the space available for maintenance.

Check the largest replaceable component

Use the manufacturer’s component envelope and weight to review the dismantling area, orientation at the opening and receiving position. Check for cable trays, valves and other fixed obstructions within the opening’s footprint.

Record the findings on the handover drawing

Identify personnel and equipment openings separately. Mark clear opening sizes, headroom and the area needed at ground level. The project team must verify lifting points, load capacity and the lifting plan. Compare the drawing with site photographs at handover.