underground concretePrefabricated pump room

Factory prefabricated and on-site assembly.

Made of reinforced concrete precast components and HDPE corrosion-resistant composite lining,
Build underground fire pools and pump rooms to coordinate water storage, water supply and ground space.

concrete structureCorrosion-resistant composite liningUnderground space utilization
PLRC / UNDERGROUND FIRE PUMP STATION01
Rendering of underground concrete prefabricated pump house, showing prefabricated pool body, fire pump unit, pipelines and maintenance entrance
Pool body and pump room · Overall layoutProduct renderings
01 / COMPOSITE STRUCTURE

Structure and lining composite

Reinforced concrete load-bearing, HDPE water protection

02 / PREFABRICATED MODULES

Main components factory prefabricated

Beam, column and side panel modules are connected to on-site assembly

03 / UNDERGROUND LAYOUT

Equipment is arranged underground

Plan ground use based on covering soil conditions

01 / INSIDE THE STRUCTURE

From a side panel,
to a complete pumping station.

The pool, pump room and top supporting facilities are arranged in a coordinated manner.
Select a system unit to understand its structure and function.

Prefabricated side panels and pool body appearance · Product rendering
Prefabricated side panels and pool body appearance · Product renderingPRODUCT RENDER
01

COMPOSITE WALL

Concrete bearing capacity. HDPE faces water.

The side panels are made of reinforced concrete anchored with HDPE hard corrosion-resistant resin. During prefabrication, the lining is combined with the structural layer, the HDPE corrosion-resistant layer is used on the water surface, and the plate connection and joint waterproofing jointly form the pool body.

Reinforced concrete / HDPE composite lining / joint waterproofing
Communication project configuration ↗

02 / BELOW GROUND. ABOVE POSSIBILITIES.

Place equipment underground.
Leave the ground to the project.

Ground uses such as greening, walking, parking or roads,
Plan jointly based on load and covering soil conditions.

Sectional rendering of underground fire pool and pump room, with ground green space above
Underground layout · Pool and pump room coordinationProduct renderings
01

Determine the purpose of the ground first

Confirm greening, road or parking needs based on the general plan, and then deepen the layout of underground equipment.

02

Check the carrying conditions item by item

Vehicle load, soil cover thickness, groundwater and anti-floating requirements jointly affect the beam, column and roof plan.

03

Maintenance channel synchronization design

Incorporate access openings, ventilation, drainage and transportation conditions into the design so that subsequent operation and maintenance can be based on evidence.

The passing plan must be calculated and confirmed based on the actual vehicle load, soil thickness and structure. The illustrations are only used to show the spatial relationship.

03 / FROM FACTORY TO SITE

Manufacturing is forwarded to the factory.
The device is connected to the site.

Use real construction photos to present the main processes.
The construction sequence and nodes are subject to the project plan.

  1. Basic productionPhase diagram, real shots of project construction
    01

    Basic production

    Review the geology, groundwater and anti-floating conditions, and complete the foundation pit and foundation.

  2. components in placePhase diagram, real shots of project construction
    02

    components in place

    Verify prefabricated components, position and install beams, columns and side panels.

  3. Connectivity and waterproofingPhase diagram, real shots of project construction
    03

    Connectivity and waterproofing

    Complete the connection, secondary pouring of the trench and waterproofing of the joints.

  4. Top plate and accessoriesPhase diagram, real shots of project construction
    04

    Top plate and accessories

    Complete roof panels, access entrances and ventilation accessories as designed.

  5. Equipment and InspectionsPhase diagram, real shots of project construction
    05

    Equipment and Inspections

    Connect pump units, pipelines and controls, and organize full water testing and debugging.

  6. Backfill and DeliveryPhase diagram, real shots of project construction
    06

    Backfill and Delivery

    Backfill according to the confirmed plan and complete the handover of site restoration and maintenance data.

04 / REAL CONSTRUCTION. REAL DETAILS.

Go into the construction site.
See every step of the assembly.

Original project photos, retaining the true construction status.
Click to view HD details.

12 Real shots of Zhang project

Photos are only corrected for orientation, proportionally scaled and compressed, retaining the original image. The pictures show different construction stages, and the configuration and working conditions vary from project to project.

05 / ENGINEERED FOR YOUR SITE

A suitable plan,
Start with specific conditions.

After the water storage needs and fire protection conditions are clear,
Then connect the structure, equipment and field interfaces one by one.

Configuration and Selection Key Points

Selection conditions for underground concrete prefabricated pump rooms
Product systemPLRC prefabricated reinforced concrete joint corrosion-resistant module fire pump station
pool wall structureReinforced concrete precast components + HDPE anchored composite lining
water storage capacityDesigned according to effective fire water storage capacity, plane size and water level conditions
Pump set configurationDesign flow, head, main and backup pumps and voltage stabilization requirements are confirmed according to the project
Underground working conditionsCovering soil thickness, ground load, geology, groundwater and anti-floating review
Engineering interfacePipeline elevation, power supply, control linkage, ventilation, drainage and maintenance conditions

The specific dimensions, load capacity, equipment parameters and scope of supply are subject to the technical plan confirmed by both parties.

01Applicable scenarios+

It can carry out program demonstration for the fire protection supporting needs of industrial parks, energy storage, wind power, photovoltaic and public construction projects. The applicability needs to be confirmed based on the fire protection design and site conditions of each project.

02What do you need to provide in advance?+

The overall site plan, effective water storage capacity, design flow and head, groundwater level and geological survey data, ground uses and loads, as well as external pipelines and power supply conditions.

03How to determine the passing plan+

Review the roof, beams, columns, pump room support and foundation plans based on the actual vehicle load and covering soil thickness, and organize the ground layout based on the location of the inspection opening.

04How to connect delivery and maintenance+

From prefabricated component verification, on-site installation to full water test, equipment debugging and data handover, it is organized according to the confirmed plan; maintenance, ventilation and drainage conditions are retained to facilitate subsequent inspection and maintenance.

EPANEL / ENGINEERING SUPPORT

Let the underground space
Taking care of your fire water supply needs.

Provide site conditions and fire protection design requirements,
EPANEL will work with you to deepen the structure and equipment plans.

Contact EPANEL · Get solution support ↗