Standard stamping plate
The bottom plate, side plates and top plate are combined with stamping plates, and the box size and block plan are determined based on the site conditions.


EPANEL / WATER STORAGE SOLUTIONS
WELDED STAINLESS STEEL WATER TANK
Standard plates, welded into boxes.
The box is composed of stainless steel stamping plates, and argon arc welding is completed on site. Together with internal ties and supports, it forms a water storage facility that adapts to the project space.

Confirm based on water quality and usage conditions
The plate seams are formed by argon arc welding
Coordinate size, interfaces and maintenance space
01 / STRUCTURE & DETAILS
Plates, welds and internal reinforcements together form a water storage structure, which is further configured around the conditions of use.

The bottom plate, side plates and top plate are combined with stamping plates, and the box size and block plan are determined based on the site conditions.
The welding of the box plate seams and connection parts is completed on site, the welds are inspected according to the process, and the welds are pickled, passivated, and cleaned.
Arrange stainless steel tie bars, columns and supports, and review the plate thickness and reinforced structure based on water depth and load.
Equipped with water inlet and outlet, overflow, sewage discharge, ventilation interfaces and manhole escalators to provide conditions for cleaning, inspection and maintenance.
02 / APPLICATIONS
Starting from water demand,
Consider water storage, installation and operating conditions together.
Configure water storage and water supply interfaces based on building water needs, and coordinate cleaning and daily management.
Determine the effective water storage capacity, operating water level and system connection conditions according to the fire protection design.
Combined with the installation location and maintenance conditions of service areas, rail transit and other projects.
Confirm materials, structures and interfaces according to media, water temperature and environmental conditions.
When installed indoors, outdoors or on building roofs, the applicability must be confirmed based on the foundation bearing, load and project design.
03 / INSTALLATION & DELIVERY
Connect foundation, welding, cleaning and water testing, so that manufacturing and on-site installation can be completed in an orderly manner.
Check the foundation size, elevation, levelness and installation and maintenance space.
Check the plates and accessories according to the diagram, and check the material, plate thickness and opening position.
Complete the bottom plate and side plate combination, plate seam argon arc welding and weld inspection.
Install internal ties, columns, roof panels, manholes and escalators.
Complete interface piping, pickling and passivation of welds and cleaning inside the box, and arrange disinfection according to use.
Check the leakage of the box and welds, and complete water testing, recording and handover.
Pipes and valves should be independently supported to avoid placing weight directly on the water tank interface. The interface direction, elevation and maintenance channel are uniformly confirmed during the planning stage.
04 / FIND YOUR TANK
Welding and bolt assembly each have their own construction concerns.
Choose based on site, maintenance and renovation needs.
| Compare items | Welded stainless steel water tank Current products | Bolted stainless steel water tank |
|---|---|---|
| Box connection | Standard plate on-site argon arc welding | Standard plate bolt and gasket connection |
| Construction concerns | On-site welding, weld inspection and surface treatment | Hole position matching, gasket and step-by-step fastening |
| Maintenance method | Check welds, interfaces and box structure | Check panel seams, seals and fastened connections |
| Transformation and migration | Evaluate the modification plan separately based on the welded structure | Removable connections, recheck and test before reuse |
| mutual confirmation | Effective volume, material, plate thickness, foundation and interface | Effective volume, material, plate thickness, foundation and interface |
06 / SELECTION & MAINTENANCE
Provide usage, effective volume and installation space,
Let’s confirm the water storage plan together.
| Product form | Stainless steel stamping plate combination, on-site argon arc welding |
|---|---|
| Board selection | The data uses SUS304-2B; the actual grade is confirmed based on water quality, temperature and environment. |
| water storage capacity | Calculated based on the design effective volume, operating water level and box length, width and height |
| Plate thickness and reinforcement | The thickness of the bottom plate, side plates, top plate and internal ties are determined according to the water depth and load. |
| Pipe interface | The caliber, direction and elevation of water inlet and outlet, overflow, sewage discharge and ventilation are configured according to the diagram. |
| Maintenance configuration | On-site layout of manholes, escalators, cleaning and drainage and operating spaces |
| Installation conditions | Review foundation bearing capacity, levelness, access conditions and on-site welding operation conditions |
| Optional items | Thermal insulation, liquid level monitoring and control linkage are determined based on project needs. |
The effective volume should be calculated in conjunction with the operating water level. The specific size, material, plate thickness, matching and supply scope are subject to the confirmed technical solution.
The combined version on this page uses on-site welding to connect the plates; the assembled plate joints are connected with bolts and sealing gaskets. Both require plate thickness, reinforcement structures and interfaces to be determined based on water depth, load and site conditions.
The box size can be deepened based on the project plane, clearance, effective water storage capacity and pipeline conditions. Manholes, escalators, cleaning and welding construction spaces should be reserved simultaneously, and the specific layout shall be subject to the confirmed drawings.
Inspect the water level, box welds and interfaces, check overflow and sewage channels; arrange cleaning and disinfection according to use. Pipes and valves should be supported independently to prevent weight and vibration from directly acting on the water tank interface.
TALK TO EPANEL