What site data do you need to select a sewage lifting unit?

An elevation sketch and a list of discharge points give the design team a starting point for equipment selection.

Put inlet and discharge points on one drawing

Mark the proposed equipment position, inlet invert and downstream connection. State the elevation datum. Record horizontal runs, bends and valve positions so the designer can assess static lift and pipe losses separately.

Information for a selection review

ItemWhat to record
SourcesList discharge points, the liquid and operating periods. Note debris or grease in the flow.
Peak inflowIdentify equipment that can discharge simultaneously, the volume of each discharge and its duration. Distinguish measured data from equipment specifications.
Elevation and pipingRecord upstream and downstream elevations, pipe lengths, diameters, bends and any downstream backpressure.
AccessRecord clear height, door openings, the delivery route and the working space for future maintenance.

Check the package against the site

For an enclosed rotary lobe lifting unit, check usable tank volume, pump duty and nozzle positions against these records. Mark discrepancies between drawings and site observations for review.