03 / PROJECT CONFIGURATION
Appropriate configuration starts from the project.
First understand the water needs and site conditions,
Then determine the equipment, interfaces and management functions.
- 01Box and material
- Overall dimensions, panels, surface treatment, door and interface locations
- Design by project
- 02Water supply pump set
- Design flow, head, number of pump units and operation mode
- Selection by project
- 03Pipeline and supporting equipment
- Pipe diameter, valves, flow stabilization or air pressure facilities and water inlet and outlet connections
- Configure according to water supply plan
- 04Control and Monitoring
- Frequency conversion control, pressure flow collection and remote communication requirements
- Configure according to management needs
- 05Security and water quality
- Video, access control, smoke sensor; water quality monitoring and disinfection optional on demand
- Optional as needed
- 06Operating environment
- Insulation, ventilation, dehumidification, noise reduction, lighting and drainage
- Design based on site conditions
The specific materials, water supply capacity, equipment composition and scope of supply shall be subject to project selection and technical documents confirmed by both parties.